We're soldering the track joints that have been laid and installed the transformer shelf.
Jack takes a break from soldering track joints and wonders where to go from there.
Installing the transformer shelf.
A small expansion of the framework will be to the left of the transformers adding a couple of feet to the sidings.
The Track Apprentice has accrued dividends from his mother lode and is continuing to invest by diversifying in mouse futures.
A work area/coffee mess has been installed.
An O-gauge work area was built in the coal bunker just on the other side of the wall from the O-gauge layout.
The coal bunker and later oil tanks fueled this monster.
The boiler is no longer used to heat the building and the building has had asbestos remediation. HVAC split systems heat and cool the first floor. We added gas hot air heat to the O and HO rooms. Two weeks ago the heating system passed inspection by the township and we finally have heat. Took "only" about a year to get it done.