Hope everyone had a Merry Christmas. Unfortunately Santa didn't do any work over the Holidays at the club so we're slowly getting back to work.
Started the install of the double doors at the end of the corridor (trying to match what would have been installed). Will install a more plane door about halfway down. Both doors will close off the corridor to conserve heat and allow us to leave the doors of both layout rooms open while we're there.
Ted (aka the Apprentice) finished painting the stairs (sorry for the fuzzy pic but Ted moves fast).
Waiting for the paint to dry to start installing the sidings for track 1.
Did some prep on the electrics panel. Need to connect power to the partially completed track 3 and 4 loops so they can be used as sidings more conveniently until they're finished.