More spackling and realignment of the glass double doors was done. The switches in the turntable and station siding area were fitted and partially installed.
The STA has developed a taste for spackling.
Add that shim and screw that screw.
Don't let the doors fall.
Switches installed and positioned. Ready to extend tracks 3 and 4.