Painting of the hallway walls and trim continued. and the first coat of paint on the glass doors was applied.
The switches and siding tracks in the station/turntable area were fastened except for the thru siding that will connect with the curve in back of the power house. Have only 7,900 more screws left.
Started laying out the area for the upper level on the side by the bunker wall.