We need to re-hang our lighted OCSMR sign with steel chain wrapped around an overhead radiator and have our electrician run a line there for power.
Locobudd made some progress this past Saturday cutting wood for the elevated 3rd and 4th line. We should have the wood cutting done in 2 weeks and start installing the elevation, then laying track.