Skip to main content

Reply to "OCSMR-Ocean County Society of Model Railroaders Club with pictures/dialogue progress. We welcome visitors. Latest update 3/18/2024"

The plane is called "Pegasus".  Catchy name.  Still if you went in reverse and dismantled the layout,  the layout is so "screwed up" that it would take longer to "remove" all those screws than the time it would take to finish the layout and build the plane.

The Apprentice learned a valuable lesson in track laying without even knowing it.  I was showing him how NOT to install track screws.

Our resident artist continues to paint the backdrop.

2017-05-19 001

Got most of the supports for the ramp made and positioned.  Will start checking clearances with the trestle and locate the end of the ramp.  Placed the end piece of plywood on the end of the "keystone" to see how it looked.  Need to keep the area by the ramp open to fasten it and install the track.

2017-05-20 0032017-05-20 0042017-05-20 005

Only 7,879 screws to go.

 

Attachments

Images (4)
  • 2017-05-19 001
  • 2017-05-20 003
  • 2017-05-20 004
  • 2017-05-20 005
Last edited by LocoBudd

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×