Shimmed the plywood at the start of the ramp, added a middle support and (not shown) tapered the tile under the left side of the pic to lower the ramp in that area.
Fastened the lead-in to the ramp.
Set the height on the straight area. The supports on the curved portion on the left (not shown) were all spaced right for the grade. The entire ramp is not fastened to the layout.
Cut two pieces of tile for the ramp lead-in.
Ted was busy mounting the two MTH Remote Commanders higher for better connectivity around the layout, pre-wiring the two TPCs for tracks 1 and 2 (have to install bypass switches between the TPCs and the Z4K), and relocating the TMCC Command Base and installing the Legacy Base in the cabinet drawer (will post pix later). Both TMCC and Legacy worked from across the room while enclosed in the cabinet drawer.