Skip to main content

Reply to "OCSMR-Ocean County Society of Model Railroaders Club with pictures/dialogue progress. We welcome visitors. Latest update 3/18/2024"

Shimmed the plywood at the start of the ramp, added a middle support and (not shown) tapered the tile under the left side of the pic to lower the ramp in that area.

2017-07-01 001

Fastened the lead-in to the ramp.

2017-07-01 002

Set the height on the straight area.  The supports on the curved portion on the left (not shown) were all spaced right for the grade.  The entire ramp is not fastened to the layout.

2017-07-01 003

Cut two pieces of tile for the ramp lead-in.

2017-07-01 004

Ted was busy mounting the two MTH Remote Commanders higher for better connectivity around the layout, pre-wiring the two TPCs for tracks 1 and 2 (have to install bypass switches between the TPCs and the Z4K), and relocating the TMCC Command Base and installing the Legacy Base in the cabinet drawer (will post pix later).  Both TMCC and Legacy worked from across the room while enclosed in the cabinet drawer.

 

 

Attachments

Images (4)
  • 2017-07-01 001
  • 2017-07-01 002
  • 2017-07-01 003
  • 2017-07-01 004
Last edited by LocoBudd

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×