Started installation of the second sheet of plywood.
Waiting for the third sheet of plywood.
Checking fit of the third piece of plywood, locating final cuts and measuring the filler strip to the wall.
Overall view of the upper level. A fourth piece of plywood will be installed in the foreground but will be left out for work on the upper level.