Second and third sheets of plywood have been installed.
Last piece to fit against the wall is installed. Used a piece of plywood from an old layout (the bulk of our layout is built from wood recycled from old, disassembled layouts).
Awaiting a portal and abutments.
Next is to lay tile (only where track will be installed), paint and lay track.
Some train runnin'.
Ted's UP SD-70 and Dan's NYC Mohawk.
My new President's LionChief Mikado pulling some beer cars. Tried loading the LionChief Bluetooth App but my not-so-smart phone has a memory problem (just like the user). The App worked fine on a tablet we have, though felt that throttle response was slow. Was able to increase the sounds volume since the App is apparently the only way to do so.