Laying tile on the upper level.
Ted performing a quality check on the bonding ability of the tile adhesive. Tastes like chicken.
Painting the installed tiles.
Waiting for the paint to dry so track location can be drawn. Installed only enough tiles for track installation. Will complete tiling after all track work is done.