All the track sections on line 3 and 4 have soldered together up until the elevated Atlas bridge. Next is to cut 2 small track sections between the switches on the other side of the bridge along the elevated trestle.
Wood to be cut next week to begin elevated construction on the other end of the elevated 3 and 4 lines.