Johnbrandt sitting down on the...er...working on the backdrop.
With the help of Ed, re-aligned right support, added filler to left support, and installed fascia to hide the plywood and tile edges of the upper level.
Edge and supports of upper level still need to be filled and painted before final installation of the trestle.