Ted making the curved track connection to the switch on track 3.
Finished installation of curve to track 3 switch. Bit of an overhang of the track on the trestle. Couldn't be avoided and should be okay. Track 4 will also overhang.
Bob aligning ties so track 4 can be fastened to the trestle cross supports.
Finished the curves on the ramp around the roundhouse and left the last piece of track loose so track being installed down the ramp can be connected.
As far was we got with track 3 on the downside. Bob fastened the track 4 track on the trestle. Just a couple of feet to go.