Ted and Tom completed the track work on track 4 but left a joint needing fastening on the ramp.
Yours truly and Tom installing the final golden spikes...er screws on track 4 at our Honorary Promontory Point.
Made the final electrical connection to track 3 on the ramp and added some jumpers across the switches by the station. Still have to make a panel for the sidings and power them. The WBB SD-45 was, once again, called to test the track. Nice to see a train run the full loop. Next is wiring track 4.
Buildings and accessories were dug out of their boxes and started cropping up on the layout.
If in the area, stop by the Manalapan Community Center for the Train Show. See the thread above this one.