The control panel and switches were installed.

2018-04-03 0012018-04-03 013

Ted was busy installing jumpers and ground throws.  Bob, later in the evening, shimmed some areas of track.  Ted took his EM-1 for a spin on tracks 3 and 4 and did find some areas that needed tweaking.  And, here's his EM-1 around the layout.

2018-04-03 0022018-04-03 0032018-04-03 0042018-04-03 0092018-04-03 0102018-04-03 0112018-04-03 0122018-04-03 0152018-04-03 0172018-04-03 018

Did experience some close clearances in a couple of places  but all made it thru.

2018-04-03 008

 

Attachments

Images (13)
  • 2018-04-03 001
  • 2018-04-03 013
  • 2018-04-03 002
  • 2018-04-03 003
  • 2018-04-03 004
  • 2018-04-03 009
  • 2018-04-03 010
  • 2018-04-03 011
  • 2018-04-03 012
  • 2018-04-03 015
  • 2018-04-03 017
  • 2018-04-03 018
  • 2018-04-03 008

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×