Skip to main content

Reply to "On30 point to point"

"Does "actually working on it" mean design or actual construction?  

 

That design is more interesting than your average shelf type switching layout. "

 

It's actually under construction--I have a thread about scratchbuilding a turnout for the layout in the O 2-R forum.

 

I've also decided to work a little On30 into the plan, and I'm keeping the double duckunder that was in my original plan (before I omitted it in the plan above) --at least until it drives me nuts!

 

Jeff C

 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×