Skip to main content

Reply to "OSB VS Plywood"

It likely is overkill, but I'm told everything on the railroad is over-engineered, so I'm just following prototype .  Some of this track has been down 20 years with I hope many more ahead, and this is in a basement with some dampness.

BTW, in some places where feeders were impossible, I soldered tinned 20 gauge copper across the rail joints

I also want to mention that in the first portion of the layout, I used 3/4" plywood (been so long, I forgot) and have experienced no difference between it and OSB.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×