Skip to main content

Reply to "Overcoming Half Basements & Obstacles"

We moved the heater out from the wall to pass behind it.  Then the tank style water heater was replaced with a Reinni tankless heater mounted in the corner to allow an additional town and yard.

The former rec room turned staging room got riddled with holes to provide passage.

A non weight bearing cinder block wall was torn down.   The walls of the former basement inlaw quarters  were ripped out.  This opened up 1986 square feet in a Tee shaped basement for the trains.

IMG_8487

Above and below are off scene staging and off scene  engine turning facilities for three dead end branch lines.

IMG_8159IMG_7919The water meter was raisedIMG_7932

Attachments

Images (4)
  • IMG_8487
  • IMG_8159
  • IMG_7919
  • IMG_7932

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×