Skip to main content

Reply to "P&D F Unit detailing for CB&Q F3"

Getting there!

 

The lionel fuel tanks were a great upgrade. Thank you, rdunniii!

 

The trailing unit is almost done, except for the journals and speed recorders. I'll work on those at the end. The p&d ones need to be cut, as they are not a drop in for the Atlas tooled trucks.

 

Upon re-assmebly, the high water pants became even more noticeable. Maybe Atlas tries to conceal it with the over sized brake cylinder lines?

 

I'm looking at decoders so I can control the lighting on the un-powered leading unit. I need one that has at least 6 lighting outputs: headlight, mars, panel gauges (1 led), interior lights (2 leds) and number boards (2 leds). ESU loksound? Suggestions?

 

DSC02270

DSC02274

DSC02276

DSC02279

DSC02289

DSC02293

the pilot height is perfect for kadees.

 

DSC02299

Attachments

Images (7)
  • DSC02270
  • DSC02274
  • DSC02276
  • DSC02279
  • DSC02289
  • DSC02293
  • DSC02299

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×