Skip to main content

Reply to "Penn Central N6A construction"

Here are some photos of the almost finished cabins. I’ve added the roof raised panels, roof ribs and the old roofwalk supports. I’m going to add a few bent studs/bolts where the roof walks were removed. There is a fine set of rivets on the edge of the roof too, I highlighted them with pencil. They are simple strips of .010” styrene with pounce wheel impressed rivets. The underframe is being constructed at the same time while glue dries on other projects.

F56697D4-A6D5-4129-9FAE-C90C4A409DEB0A1BB504-4272-42F5-91DE-B4851BE27B0492087C8E-7916-4B00-8828-74ED84902E5405EB00F8-BA76-491A-8B8C-94F596E1D3CD

Attachments

Images (4)
  • F56697D4-A6D5-4129-9FAE-C90C4A409DEB
  • 0A1BB504-4272-42F5-91DE-B4851BE27B04
  • 92087C8E-7916-4B00-8828-74ED84902E54
  • 05EB00F8-BA76-491A-8B8C-94F596E1D3CD
Last edited by Brother_Love

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×