Skip to main content

Reply to "Pennsylvania and Pacific RR Construction"

Over the past week or so I have added homasote to the tabletop and secured track down. Today I added another 8 feet to the table and worked on the turnouts which will lead to the turntable. I also added a platform for the station, paint to come later. 

Currently, waiting on some more switches from Ross and fellow forum members. I hope to get another piece of plywood up tomorrow and begin the big curve of the L. 

Plan update: since the first post I was examining my plans and decided to add a second reversing loop to counter the upper level reversing loop. I've added this to the center of the layout and it will lead to an autorack yard with 3-way switch. 

Have a great weekend,

Chris 

Attachments

Images (5)
  • IMG_0178
  • IMG_0179
  • IMG_0180
  • layout3
  • 2017-12-09_15-20-27

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×