Skip to main content

Reply to "Pennsylvania and Pacific RR Construction"

Welcome back! Not too much progress on the top of the layout this week. I have been spending a good amount of time continuing to wire up turnouts and crossovers. This seems to take me about 30 minutes a switch so it's a slow process. Around the turntable I've added some more whisker tracks, I plan to add power to them this weekend and add toggle switches to a separate control panel. This panel will also have the indexing controller for the TT. 

As you may be able to see I've added a little bit of ground cover here and there around the entry tracks to the TT. 

IMG_0446

Continuing down the backside of the layout I've ballasted some more track.

IMG_0447

Finally over at the upper level tunnels I've added some more rock molds then added sculptamold over the plaster cloth were there will not be exposed rocks. The sculptamold was then painted brown to prepare for ground cover. 

IMG_0448

Not having any snow days this week has really hampered my progress! The release of the Lionel catalog slowed me down as well! I hope to get a new video update out sometime this week. I'll be sure to post something on here when that happens. 

 

Have a great weekend!

 

Attachments

Images (3)
  • IMG_0446
  • IMG_0447
  • IMG_0448

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×