Skip to main content

Reply to "Pike Creek Railroad"

The reason I asked about the open spaces is to truly go around the room, you'll have to accommodate access to those spaces.  I did a 1/4 around the room for that reason.   I had too many openings and access requirements for me to be able to do a true around-the-room configuration.  The more thinking you do about what you want and how to access all the spaces now will pay big dividends as you build.  FWIW, I started with Mianne benchwork as well, but then a real carpentry expert came along and convinced me to get fancy with the benchwork on top of the Mianne.

Mine in process layout is a large folded dogbone on two levels, and it has a few extra loops off the large mainline.  The big box sticking up is the Mianne power lift-bridge for access to the inside, I'm too old to crawl under benchwork as a regular habit.   Obviously, not finished yet, but working on it.

Attachments

Images (2)
  • mceclip0
  • mceclip1

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×