Skip to main content

Reply to "Building the Riverdale, Pittsburgh, & Western 10x11.5+ Layout (Updated 11/19/23: Welcome to Western PA!)"

I would definitely say take a second look at your track choice. I originally planned to use Atlas and didn't put too much thought into it but ended up switching to Ross switches once I started doing the track design for my steel mill. Ross has really awesome switches/slip switches/curved switches/etc. You can fit a lot more track work into a much smaller space. I bought some Atlas track before this happened so I'm still teetering between Atlas and Gargraves for the tracks. We'll see. Regardless, I would recommend you go back to the design table and see how much more you can accomplish with Ross.

Other than that, this looks to be a cool layout. Can't wait to see it come to life!

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×