Skip to main content

Reply to "Building the Riverdale, Pittsburgh, & Western 10x11.5+ Layout (Updated 11/19/23: Welcome to Western PA!)"

Looks great. I'm interested in the same track plan for future expansion. Starting with a 4x8 now, but could see going to a longer setup like this in the future. Or one of Ken's L-shape designs, also on the table for future expansion. But not until I get my basement water under control - normally dry, but a very heavy rain (typically once a year type event) will see some water seep in through the floor/wall joints. My basement is close to 1,500 sqft, and I'm getting quotes around $9,000 to install interior french drain with two sumps around the entire perimeter.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×