Skip to main content

Reply to "Plans for Atlas O and table design."

Just got back to the train layout in almost 10 months, and finally got the inner loop together with the roadbed installed.  Next step will be the cross track in the middle with 4 turn outs connected to it.  I hope to get the butter loop finished before the year ends.

Attachments

Images (2)
  • crosstrack
  • IMG_0234: Layout on 11.11.17

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×