Skip to main content

Reply to "Port Elderley"

I've progressed to the point where I can begin completion of the sea.  I'm starting at the tug boat berth.

PE 244

Strips of 3 mm MDF are glued down at an angle, to represent the lines of swell - as the dock faces the open sea.

PE 245

Stage two is dry wall jointing compound, which is built up over the lines of swells.  By dabbing the surface with the trowel, I can pull it into small wavelets.

When it sets up, it will crack.  Then it will be flushed off with dry wall finishing compound; once again dabbing the surface to make more wavelets.

It will take at least 24 hours to set up and finish cracking.

Attachments

Images (2)
  • PE 244
  • PE 245

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×