Skip to main content

Reply to "Layout change's 08/05/2023"

Morning guys, I just had a chance to look at the latest drawing. It looks like it would be a possible build would take some thinking on how to go about making an open channel in my framing for the lower track.  Something I am going to have to consider.

Jeff you are correct I went back out and measured the Menards Seed and Feed building and it is 11 1/2", then the next one down is 10 1/2" which is the train station. The 16"s will help with a place to puta road! LOL

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×