Skip to main content

Reply to "Layout change's 08/05/2023"

Hi everyone and thank you all for the kind words! I was able to to get out to the train room yesterday and today after sitting on my rear for the last 3 days  after my knee surgery.

I was able to get all the track laid along the long wall till I ran out of room before I have to start dismantle of the rest of the old upper loop. I even got all the power drops in and connected which sucked getting back off the floor.

Well here are a couple photos of all the track, and the painted table top to make things look cleaner.

20230115_11301220230116_101323

You know it's funny I didn't think I could ever find something more exciting then washing used ballest, but sure enough I did, painting side rails of track and nail heads! LOL

I hope you all have a great week!

Attachments

Images (2)
  • 20230115_113012
  • 20230116_101323

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×