Skip to main content

Reply to "Layout change's 08/05/2023"

@mike g. posted:

Hi everyone and thank you all for the kind words! I was able to to get out to the train room yesterday and today after sitting on my rear for the last 3 days  after my knee surgery.

I was able to get all the track laid along the long wall till I ran out of room before I have to start dismantle of the rest of the old upper loop. I even got all the power drops in and connected which sucked getting back off the floor.

Well here are a couple photos of all the track, and the painted table top to make things look cleaner.



You know it's funny I didn't think I could ever find something more exciting then washing used ballest, but sure enough I did, painting side rails of track and nail heads! LOL

I hope you all have a great week!

Looking great Mike. You can see the space you've freed up for scenery. It's nice to see your plan coming together.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×