Morning guys and gals, It has been a while since my last update. Things are moving forward but at a slow rate do to my knee killing me !LOL
I have been able to work on the change to the layout, but it has been a lot of wood cutting and planning, I also had to change up some of the loop to give me room between table. It is the same plan just changed out 072 with a mixture of 072 and 054, I also mixed in some 080 curves to give me more room and shorten up the length of the table to give me room at the entrance to the train room.
I was lucky to have a friend that works at the local sawmill get me a stack of 20-year-old 2x12's that I have been able to cut down to 2x4's and another friend gave me a full sheet of 1/2" plywood.
Here are a couple of photos to prove that I have been doing something! LOL
The plywood is just sitting there, once I get the track laid out and mark its location, I will cut the plywood so I have an open grid below the next step of the upper level just so I have access to the lower track just in case! lol
I hope you all have a great weekend and find time for your layout and trains!