Skip to main content

Reply to "Post war ZW transformer circuit breaker pops after 5 - 10 minutes of running 3 trains simultaneously; what's up?"

I would think that if one manufacturer installed these in their locos, it would be a great marketing tool to use against the competitor who does not install them.

 

 

Last edited by Drummer3

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×