Skip to main content

Reply to "Post your switching layout images"

My industrial area feeds off my main layout. Cars arrive and depart in 10-12 car trains. Here a train is awaiting departure on the arrival/departure track.

ADD41482-1676-4423-A58E-F5AD300A2D0F

After arriving, cars are sorted into two separate industrial switching jobs and set up for delivery to east and west areas separated by a river. The following is the schematic and overview of the West side.

99DB8B14-0C57-4EBD-A719-235F8142D021

B543022E-9B91-4CBD-BD3C-D6247CE058E1

Here’s the east side schematic and overview.

38BC8F70-D7B6-4DF9-BDF2-EB04DA190937

5DB0D105-50F6-41E6-AC5A-F7D99AAB51A5

It takes me about an hour to receive the arrival train, set out the departure train, sort and block the two industrial jobs, do the pickup and delivery for both jobs which puts me in a position to restart the process the next time I go downstairs!

Attachments

Images (5)
  • ADD41482-1676-4423-A58E-F5AD300A2D0F
  • 99DB8B14-0C57-4EBD-A719-235F8142D021
  • B543022E-9B91-4CBD-BD3C-D6247CE058E1
  • 38BC8F70-D7B6-4DF9-BDF2-EB04DA190937
  • 5DB0D105-50F6-41E6-AC5A-F7D99AAB51A5

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×