I've watched that video in the past. I like the track plan and two train automated operation. If you watch the film, during two train operation the switch track on the right, in your diagram changes direction so that the train coming down the grade turns into the middle track. In the film at 19:18 it's the closest switch track to the camera. I'm trying to figure out what triggers the change and how it's done.
|