Skip to main content

Reply to "Postwar Inspired Mountain Pass Railroad - 12.27.19 update"

Here is the sad state of current affairs:

A9F011C0-AD71-49A0-BA70-26E4A97A559F

I need to move the table across the room into a smaller nook area. I will be building some general storage shelves where the table currently sits.  Once that’s done, I can get going on setting everything up again.

The track wiring is still connected under the table, but I am re-doing the power to the two parallel tracks that you see to the far right. I wanted to add toggle switches to each siding to be able to use them as true passing sidings. Yesterday, I built a small box to hold the toggles and added a light bulb to indicate if the siding is on or off. 

Attachments

Images (1)
  • A9F011C0-AD71-49A0-BA70-26E4A97A559F

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×