TEDW, Thanks for the heads up with the video ,i have everything ready all blinking signs have been moved ,1 building has been also moved ,the only thing i want to do now is run the wire from the switch to the strip mall ,but i wasn't sure if 20 gauge wire was ok to use because the strip mall has over 50 led's ,the wire i have is two wire ,red & black which is the right colors,i don't care if it is over kill i just happen to have  plenty of it ,i just want to make sure it is heavy enough,as soon as i get a response from someone i will run the wire & have it ready when the building gets here ,it was suppose to be delivered Saturday .but has been updated to come Friday ,i have never seen such fast service especially coming from Wisconsin { i think i spelled it right } looking forward to finishing this project.