Skip to main content

Proposed Postwar Layout Command/Traditional Question

Hi All - I have been struggling for a while on ideas for a new layout. My latest thought is to build a traditional postwar one that could run TMCC/Legacy postwar type equipment too if the mood struck me.

My question is should I set the layout up first and foremost as a command layout that would allow me to then run 50's equipment through the Legacy Cab-2 and a power bridge? I am not sure if I build it first as strictly traditional, with fiber pins in the track, can I then go to command if I wanted to? I think I have to do some special wiring because of the reversing loops and I'm not sure of the impact to utilizing command at that point. I have attached a pic of the proposed layout. 

Attachments

Images (1)
  • 2022 Lionel Postwar
Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×