Skip to main content

Reply to "Proposed Solution to DCS Watchdog in Yard Tracks (DCS-RC WD Gerber Files Added to First Post)"

I guess there's nothing to be gained by beating the "R1 should have been a trimpot" drum.

I think the R1-C1 time-constant should be linear.  So if initially measuring 800 msec using R1=1.0M, then targeting 950 msec would suggest R1=950/800=1.19 M, so 1.2M should do the trick.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×