Updated 10/13/2019:

Well, chaos reigns!  We pulled the bridge in preparation for working on the C&P River Route.

DSCN6986

Construction of the River Route began with the laying down of a 5/8" piece of plywood to elevate the area.  Would that be called the sub-sub-roadbed?   Here's a look from the front and from the side along the river.  We needed to match heights with table built under the layout.

DSCN6987DSCN6988

That was followed by the sub-roadbed.  This is another 5/8" piece of plywood cut to match the O42 curve.

DSCN6990

Finally, I started laying track.  The red wire is for super elevation.

DSCN6993

Here's the same area from behind the Pier 7.  It's a little dark, but there is an O54 switch back there.  I'm planning a hidden siding on the C&P River Route.

DSCN6995

More when I know it.  

George

Attachments

Images (6)
  • DSCN6986
  • DSCN6987
  • DSCN6988
  • DSCN6990
  • DSCN6993
  • DSCN6995

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×