Skip to main content

Reply to "PRR Panhandle 2.0"

Updated 8/5/2017:

The new track lighting has been installed in the workshop and the train room!

Good shot of my pegboard getting utilized as well.

DSCN2773DSCN2774DSCN2777DSCN2778DSCN2779DSCN2780

That's motor inspector Samantha performing her duties - checking out the new lights.

DSCN2781DSCN2782DSCN2783

The final number and position of heads, as well as type of LED bulb (I currently favor 4100K) will be determined after the backdrop is installed.  That will give me something to evaluate lighting choices against.

This is a major step forward!

George

Attachments

Images (9)
  • DSCN2773
  • DSCN2774
  • DSCN2777
  • DSCN2778
  • DSCN2779
  • DSCN2780
  • DSCN2781
  • DSCN2782
  • DSCN2783

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×