Updated 8/9/2017:

Just a few random thoughts, ramblings, and updates.

  • While the train room is in pretty good shape, the workshop is lagging the play a bit. I've still got tools to hang on the pegboard, equipment to move downstairs from the garage, modeling supplies to get onto shelves, and books / software to get onto the bookshelves.
  • I've decided that I am moving the house-related supplies and materials (wall anchors, hooks, repair items, wall plates, old TV coax cables, etc.) into labeled bins and storing them in the closet or attic. This stuff will be rarely used, and it really shouldn't take up space in the workshop.
  • I have re-worked the RR-Track plan to plan (in detail) the Staging Area benchwork. This will be the first area constructed. Once it is in place, the backdrop will go in place. It's due to be photographed in early October.
  • I've located a source for the good plywood I want to use on the layout. Will probably place a small order in the next 1-2 weeks just for the Staging Area.
  • Will also start thinking about what track and switches are needed for Staging. That will get ordered in time for pickup at York.
  • I'm looking forward to next week's Steel Mill Modelers Meet in Bethlehem. Should be enlightening and directly applicable to the Weirton museum layout.


That's the current thinking.

George