Skip to main content

Reply to "PRR Panhandle 2.0"

Updated 9/9/2017:

  • Went through some storage boxes and retrieved a lot of research material.  That's now organized and filed so I can access it.
  • Hung all the artwork in the workshop and train room.
  • Finished assembling the spray booth.
  • Ordered a fence for the drill press.
  • Bought screws and carriage bolts, washers, nuts for the Staging Area bench work (and beyond).
  • Ordered switches for the Staging Area from Ross Custom Switches.
  • Estimated the amount of shelving that will be needed in the Staging Area.  Requested a quote from one of the vendors.
  • Started applying shellac to the Staging Area bench work lumber.  That's currently in the garage.


I still have a few more things to do in the workshop before I can declare victory - set up the table saw, get the work spaces cleared, and run the sweeper.  But it's very close.

George

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×