Skip to main content

Reply to "PRR Panhandle 2.0"

Updated 11/30/2017:

  • Had my trigger finger surgery this morning - recovery in progress.
  • Over the past 6 days, in between Thanksgiving and kid visits, I determined the correct dimensions of ladles and bridge cranes for the Open Hearth. That led to yet another recalculation of building height and proportion values. The Charging side of the Open Hearth is elevated; fitting the crane's height and the ladle size into the smaller bay didn't work as planned. As a result, the height of building needed to be increased. Even with more height, it turned out that the plan to put the Run-Around Track through the Open Hearth was unworkable. I have re-routed the Run-Around Track to outside the building (part of the Blast Furnace complex).
  • Here's the original plan.
  • Open Hearth Track Layout
  • Here's the new plan, which eliminates 1 switch.

PRR Panhandle 2.0 v036-Right

George

Attachments

Images (2)
  • Open Hearth Track Layout
  • PRR Panhandle 2.0 v036-Right

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×