Updated 7/25/2018:

There are a lot of things in motion at the moment. 

  • I am in the process of shellacking the remaining wood components (sheets and 2 x 2's) still to be installed.
  • The remainder of the masonite divider will be installed along with 1 table surface.
  • I have placed the order for the rest of the lumber to be used in bench work construction. It should arrive on Friday.
  • I am preparing the garage to receive this lumber and shellac it.
  • The corrected sections of the backdrop are scheduled to be printed and arrive here early next week.
  • I am going to take down the backdrop sections currently on the train room walls and store them in the workshop (to protect them from a certain bad cat  ). The new backdrop sections will go there as well.
  • Wall preparation (for backdrop installation) will begin sometime next week or the week after.
  • Finally, the approach spans for the bridge should be in my possession by Saturday.

 

Things are moving!   

George