Skip to main content

Reply to "PRR Panhandle 2.0"

Updated 8/13/2018:

We installed the final backdrops on the long wall of the train room.

For the Ohio River backdrop (2 pieces - 1 top & 1 bottom) we needed a level line higher than the 50" bench work height marker. That's why the laser level (on the tripod) is sitting on a table.

Benchwork_141_

This photo show both the top and bottom of the Ohio River panel in place.

Benchwork_142_

Here's the West Virginia side (panels 4A & 4B).

Benchwork_144_

Finally, the troublesome panel 4C was installed and then trimmed to fit the space. That worked!

Benchwork_151_

The divider between the Staging Area and remainder of the layout was spackled and sanded.  We will install those 2 backdrops tomorrow or after some bench work is completed.

Benchwork_146_Benchwork_149_

More when I know it.  

George

Attachments

Images (6)
  • Benchwork_141_
  • Benchwork_142_
  • Benchwork_144_
  • Benchwork_151_
  • Benchwork_146_
  • Benchwork_149_

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×