Updated 8/21/2018:
The big accomplishment today was the use of the laser level and shims to adjust the height of the WV side of the bridge. Last week the effort to obtain the correct difference between the River Route and height of the bridge resulted in some adjustment of the main bench work.
First thing we did was to bolt together tables 7 & 17.
Then we detached the tables from the wall.
Next we shimmed the table to the correct height.
Finally, we checked the height with the laser.
More when I know it.
George