Skip to main content

Reply to "PRR Panhandle 2.0"

Updated 7/23/2019:

Not much to actually show you, but yesterday I did pull 80’ of red and 80’ of black 12 gauge wire off their spools and cable tied them together. That’s the bus for the River Route.  I also calculated the lengths of the remaining 7 buses and finalized the location of the power distribution panel. It’s directly under the hatch.

This evening I pulled the 50' (red & black wires) of the Steubenville bus.

The organization of components on the 2’ x 6’ power distribution panel is still in flux.

George

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×