Skip to main content

Reply to "PRR Panhandle 2.0"

Updated 8/11/2019:

While I haven’t posted much, I have been busy on a number of fronts.

The power distribution panel has been laid out. It’s 2’ x 8’ and will be installed near the access hatch. Electrical parts, wire, and connectors have been acquired. Work on this has been progressing. I sold two BPC’s that I didn’t need and acquired the one TPC that I did need.  I anticipate the arrival of the TPC on Wednesday.

While I don't run DCS and therefore don't need "magic" light bulbs, I have equipped each district with a light bulb to indicate power is flowing through it.  The panel will be mounted vertically under the layout.  It will be too dark to read meters under the layout and these will give me a quick indication of status.  Panel wiring for 3 of the 8 power districts has been completed.

George

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×