Updated 3/10/2013:
Have made a number of planning and research types of improvements:
- Updated the layout plan at the Building layer (way out of date) to:
- Correctly position the Open Hearth Mill on the plan
- Place the 5x5 oxygen tank structure just south of the Open Hearth
- Pick new locations for the two floodlight towers in the Weirton Steel yard
- Correctly place the Blooming Mill on the layout plan
- Correctly size and place the Strip Steel building on the layout
- Correctly size and place the Mill Administration Building on the layout. Began researching this building's appearance circa 1957.
- Correctly size and place the Quality Control Lab on the layout (new building). Began searching for photos and sources of glassblock windows for this building.
- Updated the layout plan at the Scenery layer to:
- Indicate a land form and scenic divider between Weirton Junction (north) and City of Weirton (south). Two sided divider will separate these two scenes.
- Correctly place the PRR Weirton Junction (WC) Interlocking tower on the layout.
- Installed, but did not electrically connect, the two floodlight towers in the WSX yard.
- Updated the electrical diagram for DC busses used in lighting or powering accessories (terminal strip => connector plug => terminal strip internal to accessory).
George