Skip to main content

Reply to "PRR Panhandle Division"

Updated 3/10/2013:

 

Have made a number of planning and research types of improvements:

  • Updated the layout plan at the Building layer (way out of date) to:
    • Correctly position the Open Hearth Mill on the plan
    • Place the 5x5 oxygen tank structure just south of the Open Hearth
    • Pick new locations for the two floodlight towers in the Weirton Steel yard
    • Correctly place the Blooming Mill on the layout plan
    • Correctly size and place the Strip Steel building on the layout
    • Correctly size and place the Mill Administration Building on the layout.  Began researching this building's appearance circa 1957.
    • Correctly size and place the Quality Control Lab on the layout (new building).  Began searching for photos and sources of glassblock windows for this building.
  • Updated the layout plan at the Scenery layer to: 
    • Indicate a land form and scenic divider between Weirton Junction (north) and City of Weirton (south).  Two sided divider will separate these two scenes.
    • Correctly place the PRR Weirton Junction (WC) Interlocking tower on the layout.
  • Installed, but did not electrically connect, the two floodlight towers in the WSX yard.
  • Updated the electrical diagram for DC busses used in lighting or powering accessories (terminal strip => connector plug => terminal strip internal to accessory).

George

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×