I've been making progress on the Standard Slag module.  Photo 1 show a set of steel pilings (center) that I have placed but not glued.  What's new is the foundation piece at the bottom of the stack that brings the pilings to the correct level.  This section also protrudes a bit from the wall to the right.  That wall will hold up a slipping embankment.

 

Std_Slag_W13_012

 

The second photo shows the steel pilings that will occupy the pink foam wall to the left in Photo 1.  This set of pilings has been glued to a piece of cardboard which will then be positioned and secured in place.

 

Std_Slag_W012_007

 

Photo 3 shows the inside of the Open Hearth mill.  Looking up you can see the smokestacks protruding through the roof.  The circuit board for the animation will probably set under the smokestack platform to the left.

 

Open_Hth12_010

 

 

George

 

Attachments

Images (3)
  • Std_Slag_W13_012
  • Std_Slag_W012_007
  • Open_Hth12_010
Last edited by G3750

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×